Traditional models for project management have not adequately incorporated a number of factors that are important for resource allocation. This paper proposed a unified timed Petri net model in which scheduling and planning were collectively carried out to take full advantages of the flexibility of the FMS. Through the lens of system theory, two types of resources were distinguished: major role and auxiliary role, and the major role was used to construct the FMS' Petri net. The method simplified the Petri net's construction and gave a clear flow chart for scheduling. Hence, the auxiliary resource allocation could be easily carried out according to the schedule, which was proposed by heuristic search algorithm. At last, the efficacy of the Petri net model for online scheduling in a resource constrained environment was discussed.
Aim To find an effective and fast algorithm to analyze undersampled signals. Methods\ The advantage of high order ambiguity function(HAF) algorithm is that it can analyze polynomial phase signals by phase rank reduction. In this paper, it was first used to analyze the parameters of undersampled signals. When some conditions are satisfied, the problem of frequency confusion can be solved. Results and Conclusion\ As an example, we analyze undersampled linear frequency modulated signal. The simulation results verify the effectiveness of HAF algorithm. Compared with time frequency distribution, HAF algorithm reduces computation burden to a great extent, needs weak boundary conditions and doesn't have boundary effect.